Wonderful job on our post flood restoration at Ms B Restaurant. Always willing to answer my questions or make a recommendation even after the work was completed. We Would definitely use MJNI Projects for future tenant improvements.

Drywall and steel stud framing in Fort McMurray
Steel stud framing and drywall for commercial and light industrial interiors in Fort McMurray. Walls go up where the drawings put them, then get boarded, taped and mudded to the finish your spec calls for.
Drywall & Steel Stud Framing.
- Steel stud partition walls
- Door and window openings
- Box-outs
- Drywall board
- Taping and mudding
- Finish levels to spec
- Office enclosures in industrial buildings
- Drywall repairs
MJNI job photos.
MJNI job photo
MJNI job photo
MJNI job photoSimple, start to finish.
- 01
Layout
Walls snapped out on the slab from the drawings.
- 02
Framing
Steel track and studs set plumb, with openings for doors and windows.
- 03
Rough-in
Walls stay open while the electrical and mechanical trades run their lines.
- 04
Board, tape, mud
Board hung, joints taped and mudded, screws spotted, ready for paint.
Built for the people who run commercial space.
We work for general contractors as the drywall and steel stud trade, and directly for building owners and property managers. Our project experience includes CCS Engineering and Construction, CBS Construction Ltd. and Caston Construction Ltd.
Fort McMurray and Wood Buffalo.
Based in Fort McMurray and working across the Wood Buffalo region, and now taking projects in Edmonton and Calgary.
What clients say after handover.
MJNI Projects Inc performed very professionally with great communication and excellent onsite project management. They earned our confidence during the Tenant Improvement and Restoration projects at our Timberlea and Synergy Pharmacies. We Highly recommend them.
Everything inside the walls.
Why are commercial interior walls framed with steel studs?
Light-gauge steel studs are the standard for commercial partition walls because steel does not burn, rot, shrink or twist, and every stud is straight and the same size. That makes walls faster to build and easier to keep plumb. MJNI Projects frames and boards steel stud walls for commercial and industrial interiors in Fort McMurray.
What drywall finish level do you provide?
Drywall finish is usually specified from Level 0 to Level 5. Most painted commercial walls are finished to Level 4, and Level 5, a skim coat over the whole surface, is used where strong side lighting or glossy paint would show flaws. MJNI finishes to the level your drawings or spec call for.
Do you take drywall and steel stud work from general contractors?
Yes. MJNI Projects works as the steel stud and drywall trade for general contractors, as well as directly for owners. Its project experience includes CCS Engineering and Construction, CBS Construction Ltd. and Caston Construction Ltd. Send the drawings and the schedule for a price on your package.
Can you build offices inside an industrial building?
Yes. MJNI has framed, boarded, taped and mudded office enclosures built inside an industrial plant, with the window openings framed in. The same steel stud and drywall methods work inside shops, warehouses and plants, planned so the facility keeps running around the work.
Ready to talk about your drywall & steel stud framing project?
Tell us what you need and get a quote from a local general contractor.
